Home/Services/Installation
Service

Installation

Project-managed delivery from first survey to switch-on — scheduled around your opening date and your guests, commissioned properly and handed over with documentation you can actually use.

Project managed Survey to switch-on Scheduled around guests Clean cabling Commissioning Handover docs
Why it matters

A network is only as good as the day it was installed.

The best design fails if it's rushed, cabled badly or switched on the morning guests arrive with no time to test. Installation is where timelines, trades and a live building collide — and where most projects lose days. We project-manage the delivery end to end, work around your opening and your occupancy, and don't call it done until it's commissioned, tested and handed over with the documentation that lets anyone support it later.

One team accountableWe project-manage the whole delivery — survey, cabling, configuration and sign-off — so you have a single point of accountability.
Scheduled around the buildingWork planned around your opening date, occupancy and other trades — not in spite of them.
Commissioned, not just connectedEvery access point and link is tested and verified before switch-on, with documentation handed over at the end.
What's included

Designed, built and run — end to end.

Project management

A managed plan with milestones, coordination and a single point of contact.

Confirmation survey

We verify the design against the building before any cable is run.

Structured cabling & mounting

Clean, labelled cabling and tidy access-point mounting throughout.

Configuration & commissioning

Every device configured, every link tested and signed off before switch-on.

Switch-on around your opening

Go-live scheduled to your opening date and occupancy, with time to test.

Handover documentation

As-built diagrams, credentials and an asset list — so it's supportable later.

How it works

From survey to switch-on — and beyond.

01
Survey & plan

We confirm the design on-site and build a delivery schedule around your dates.

02
Cable & install

Structured cabling and access points installed cleanly and labelled.

03
Commission

Every device configured and every link tested before go-live.

04
Switch-on & handover

We go live around your opening and hand over full documentation.

The details

Specs, plainly.

DeliveryProject managed · survey to switch-on
SchedulingAround opening date & guests
CablingStructured · labelled · tidy
CommissioningEvery link tested before go-live
HandoverAs-built docs · credentials · asset list
AccountabilitySingle point of contact
Questions

What hoteliers ask.

Can you install while we're open and operating?

Yes. We schedule around occupancy and back-of-house operations, phasing the work and switch-on so guests and staff are disrupted as little as possible. Pre-opening properties get a plan built around the opening date.

Do you install a design we already have?

Yes. We can deliver a design we produced or one from another party — we run a confirmation survey first to verify it against the building before any cabling starts.

What do we get when the install is finished?

A commissioned, tested network and a handover pack: as-built diagrams, device credentials and an asset list — everything needed to support the network afterwards, by us or anyone else.

Get a quote

Planning a new build, a refurb, or fixing what you have?

Tell us about the property and we'll come back with a clear, fixed-scope proposal.

Get a quote